TransPacific Energy, Inc. Logo

Innovative Solutions for A Cleaner World, Call Us at (619) 272 9131
Partner: EPA's Combined Heat and Power Partnership

Service Area: Nationwide
Recommended Links: | DSIRE USA™ | EPACHP™ Department of Energy™  FERC

DoE; Tax, Credits & Rebates


 



 

 

 

 

www.acmeenergyinc.synthasite.com

Turbine Performance As A Function Of Design

We deliver complete turn-key installations from initial surveys to full design build projects. We mitigate risk through such vehicles as outsourcing projects through Power Purchase Agreements, Build Own Operate and Maintain (BOOM) and ongoing 24/7 service and support. Acting as the customer's representative we advise and oversee projects from concept through commissioning to assure full compliance with project design, scope and performance.

Projected ORC performance: Flue Gas- Single Unit  

Projected ORC performance: Hot Water-Single Unit  

  • Please contact us for projected performance under other conditions and the use of Split  and Cascade units for maximum heat recovery and power generation.
  • We also offer units with Air-Cooled and Water-Cooled condensers.
  • All vapor turbine design and characteristics are for illustration purposes only. Final product may vary depending upon operating and design conditions. 

 


Turbine Design

Performance

    4 stages

    Efficiency tt = 86.6%

    Efficiency ts = 85.5%

    Power out = 930 kW


Turbine Efficiency
Turbine Efficiency

Turbine Curve
Turbine Curve

Turbine Performance
Turbine Performance As Function Of flow Rate

nhr

NHR PERFORMANCE & EFFICIENCY CHARTS

NHR EFFICIENCY CHARTS

Net Heat Rate NHR

TransPacific Net Heat Rate

NHR Btu/Kwh
Gas Turbine11,808.66
Rankine Cycle8,244.00
Organic Rankine Cycle7,030.25


For Technial Literature